Hello, I wanted to switch the splash.mp4 in my build. The original one is 1.5 secs long and the one I want to replace it with is 10 secs long. I was successful in swapping the videos and making it so the whole video plays out, but I can't figure out how to delay the start of RetroFE until the video is over. 1.5 secs into the splash video, I can hear and interact with RetroFE in the background. Is this possible?